Home > Shikun & Binui SBI Infrastructure > Projects
SHIKUN & BINUI SBI INFRASTRUCTURE
PROJECTS
Photo: : Arik Tapiero
OXEC2 HYDROELECTRIC POWER PLANT
Phase II of the OXEC 1 – upstream. The project includes diversion of the river using steel beams, with an integral concrete dam that features a machine…
READ MORE
Phase II of the OXEC 1 – upstream. The project includes diversion of the river using steel beams, with an integral concrete dam that features a machine…
READ MORE
Photo: Arik Tapiero
CUNDINAMARCA ROAD
Paving of a 154-km long toll road to be operated by Shikun & Binui for 25 years, as part of a multi-national project to upgrade the country’s…
READ MORE
Paving of a 154-km long toll road to be operated by Shikun & Binui for 25 years, as part of a multi-national project to upgrade the country’s…
READ MORE