XACBAL HYDROELECTRIC POWER PLANT
Supervision over the planning, construction and delivery of the power plant under a turnkey contract (EPC). The project includes a transport canal, a pressure pipe, a power plant, a man-made reservoir, a substation, access roads (3.5 km of asphalt paving), signaling, protective work, etc.
PALO VIEJO HYDROELECTRIC POWER PLANT
Planning and execution of a 86-MW hydroelectric power plant.
KATOSI ROAD
Upgrading of the 74-km road connecting Mocono, Ketusi, Kisuge and Nyinga in Uganda.
East West
The EAST WEST project, Nigeria is being built by Shikun & Binui SBI Infrastructure. Dualization of 99 km highway including construction of 840 m bridge over the Imo river and 200 m bridges over the highway. The project involves complex engineering processes as working on barges in an aquatic environment.