OXEC2 HYDROELECTRIC POWER PLANT

SBI_OXEC2

Phase II of the OXEC 1 – upstream. The project includes diversion of the river using steel beams, with an integral concrete dam that features a machine room and electromechanical systems built in two stages.

JKIA-MACHAKOS ROAD

SBI_JKIA-Machakos-Road

Rehabilitation of a 33.5-km road and construction of a new 12.5-km section, including two bridges and water passages.

CUNDINAMARCA ROAD

SBI_Cundinamarca-Road

Paving of a 154-km long toll road to be operated by Shikun & Binui for 25 years, as part of a multi-national project to upgrade the country’s road system

ILESHA DAM

SBI_Ilesha-Dam

Planning and execution of a dam, including diversion of a canal, pumping facility, generators and laying of pipelines.

ABUJA-ABAJI ROAD

SBI_Abuja-Abaji-Road

Paving of a 54.70 km road, including bridges totaling 195 meters in length and a drainage system.

NATIONAL LIBRARY BUILDING

SBI_National-Library-Building

A complex spanning five 8-10-story buildings, two floors of underground parking and office buildings, over a total area of about 72,000 m².

FRANJA TRANSVERSAL DEL NORTH

SBI_Franja-Transversal-del-North

Planning, paving and maintenance of a 330-km long road in the north of the Guatemala – one of the main traffic arteries connecting Central American countries.

icon_sent@3x
תודה! פנייתך התקבלה.

במידה וקורות החיים יימצאו מתאימים למשרה, נציגינו ייצרו עמך קשר.

במידה ולא זומנת לראיון או למבחני מיון בתוך 30 יום מפנייתך, לא תיחשב כמועמד ויש לראות הודעה זו כהודעה בכתב על אי
 קבלתך לתפקיד, בהתאם להוראות החוק.