A project to design, construct and operate, for a period of 15 years, a facility for removing nitrates from ground water pumped from the aquifer for the Mei Hadera Corporation.
The treatment method is based on selective electrolysis technology, which allows for the reduction of nitrates to the level permitted for potable water according to Israeli standards.
ABOUT THE PROJECT
A project to design, construct and operate, for a period of 15 years, a facility for removing nitrates from ground water pumped from the aquifer for the Mei Hadera Corporation.
The treatment method is based on selective electrolysis technology, which allows for the reduction of nitrates to the level permitted for potable water according to Israeli standards.