Reconstruction of the MD 85 and I-270 interchange, including approximately 1.1 miles of MD 85 and 1.3 miles of I-270 is underway. Work consists of the widening of more than two miles of roadway, the reconstruction of ramps and approaches, utility relocations, and the installation of drainage, sidewalks, highway lighting, traffic signals, and SWM facilities. The project also includes the removal of existing I-270 twin bridges over MD 85 and rebuilding a new three-span, 450’ long and 120’ wide structure to carry I-270 northbound and southbound traffic over MD 85.
Reconstruction of the MD 85 and I-270 interchange, including approximately 1.1 miles of MD 85 and 1.3 miles of I-270 is underway. Work consists of the widening of more than two miles of roadway, the reconstruction of ramps and approaches, utility relocations, and the installation of drainage, sidewalks, highway lighting, traffic signals, and SWM facilities. The project also includes the removal of existing I-270 twin bridges over MD 85 and rebuilding a new three-span, 450’ long and 120’ wide structure to carry I-270 northbound and southbound traffic over MD 85.