Solel_hadassa
Photo: Spector Amisar Architects

WATSMAN DAVIDSON HOSPITALIZATION WING

ISRAEL, HADASSAH, JERUSALEM

AT A GLANCE

PROJECT STATUS

Completion date: April 2014

CONSTRUCTING COMPANY

DEVELOPING COMPANY

Margolin Bros Engineering & Consulting Ltd.

About the project

The construction of The Hadassah Hospitalization building - an Eco-Tech building combining oncology and technology. The 14-story building includes 5 underground floors, 20 transparent elevators, three escalators, four bridges and two tunnels connecting the medical center and parking lot. The buildings span 86,000 m², with a typical floor covering an area of ​​4,200 m², 248 hospitalization rooms and 350 beds, four healing gardens and 24 operating rooms that are some of the most advanced in the world.

ABOUT THE PROJECT

The construction of The Hadassah Hospitalization building - an Eco-Tech building combining oncology and technology. The 14-story building includes 5 underground floors, 20 transparent elevators, three escalators, four bridges and two tunnels connecting the medical center and parking lot. The buildings span 86,000 m², with a typical floor covering an area of ​​4,200 m², 248 hospitalization rooms and 350 beds, four healing gardens and 24 operating rooms that are some of the most advanced in the world.

AT A GLANCE

PROJECT STATUS

Completion date: April 2014

CONSTRUCTING COMPANY

DEVELOPING COMPANY

Margolin Bros Engineering & Consulting Ltd.

Related projects

icon_sent@3x
תודה! פנייתך התקבלה.

במידה וקורות החיים יימצאו מתאימים למשרה, נציגינו ייצרו עמך קשר.

במידה ולא זומנת לראיון או למבחני מיון בתוך 30 יום מפנייתך, לא תיחשב כמועמד ויש לראות הודעה זו כהודעה בכתב על אי
 קבלתך לתפקיד, בהתאם להוראות החוק.