Photo: Rami Zarnger

SEWAGE TREATMENT PLANT, NETANYA

ISRAEL, NETANYA

AT A GLANCE

PROJECT STATUS

Beginning of operation: December 2014

CONSTRUCTING COMPANY

About the project

The design, construction and delivery of an odor treatment facility to treat odors at the Netanya Sewage Treatment Plant for Elco. The treatment method is based on a biological substrate with bacteria which break down the sulfites and odor molecules to the permitted level.

ABOUT THE PROJECT

The design, construction and delivery of an odor treatment facility to treat odors at the Netanya Sewage Treatment Plant for Elco. The treatment method is based on a biological substrate with bacteria which break down the sulfites and odor molecules to the permitted level.

AT A GLANCE

PROJECT STATUS

Beginning of operation: December 2014

CONSTRUCTING COMPANY

Related projects

icon_sent@3x
תודה! פנייתך התקבלה.

במידה וקורות החיים יימצאו מתאימים למשרה, נציגינו ייצרו עמך קשר.

במידה ולא זומנת לראיון או למבחני מיון בתוך 30 יום מפנייתך, לא תיחשב כמועמד ויש לראות הודעה זו כהודעה בכתב על אי
 קבלתך לתפקיד, בהתאם להוראות החוק.