POLICE WATER WELL

ISRAEL, HADERA

AT A GLANCE

PROJECT STATUS

Beginning of operation: Oct. 2016

CONSTRUCTING COMPANY

About the project

A project to design, construct and operate, for a period of 15 years, a facility for removing nitrates from ground water pumped from the aquifer for the Mei Hadera Corporation. The treatment method is based on selective electrolysis technology, which allows for the reduction of nitrates to the level permitted for potable water according to Israeli standards.

ABOUT THE PROJECT

A project to design, construct and operate, for a period of 15 years, a facility for removing nitrates from ground water pumped from the aquifer for the Mei Hadera Corporation. The treatment method is based on selective electrolysis technology, which allows for the reduction of nitrates to the level permitted for potable water according to Israeli standards.

AT A GLANCE

PROJECT STATUS

Beginning of operation: Oct. 2016

CONSTRUCTING COMPANY

Related projects

icon_sent@3x
תודה! פנייתך התקבלה.

במידה וקורות החיים יימצאו מתאימים למשרה, נציגינו ייצרו עמך קשר.

במידה ולא זומנת לראיון או למבחני מיון בתוך 30 יום מפנייתך, לא תיחשב כמועמד ויש לראות הודעה זו כהודעה בכתב על אי
 קבלתך לתפקיד, בהתאם להוראות החוק.