Phase II of the OXEC 1 - upstream. The project includes diversion of the river using steel beams, with an integral concrete dam that features a machine room and electromechanical systems built in two stages.
ABOUT THE PROJECT
Phase II of the OXEC 1 - upstream. The project includes diversion of the river using steel beams, with an integral concrete dam that features a machine room and electromechanical systems built in two stages.