Photographer: Dagans avs

EM HAMOSHAVOT BRIDGE

ISRAEL, PETAH TIKVA

AT A GLANCE

PROJECT STATUS

Completion date: March 2011

CONSTRUCTING COMPANY

DEVELOPING COMPANY

Yahel Engineers

DEVELOPING COMPANY

Ayalon Highways

About the project

The construction of a bridge over Highway 4 - north of Geha Junction - which crosses Em Hamoshavot Road to connect the Ayalon Mall area to Petah Tikva’s new industrial zone. The bridge is 242-meters long and 22-meter wide and features 5 spans, 50-meters each. The bridge pavement is designed and comprised of precast sections using the Balanced Cantilever Method. The precast sections - manufactured by the company’s precast concrete plant - are considered to be the widest sections ever implemented in a bridge of this type in Israel.

ABOUT THE PROJECT

The construction of a bridge over Highway 4 - north of Geha Junction - which crosses Em Hamoshavot Road to connect the Ayalon Mall area to Petah Tikva’s new industrial zone. The bridge is 242-meters long and 22-meter wide and features 5 spans, 50-meters each. The bridge pavement is designed and comprised of precast sections using the Balanced Cantilever Method. The precast sections - manufactured by the company’s precast concrete plant - are considered to be the widest sections ever implemented in a bridge of this type in Israel.

AT A GLANCE

PROJECT STATUS

Completion date: March 2011

CONSTRUCTING COMPANY

DEVELOPING COMPANY

Yahel Engineers

DEVELOPING COMPANY

Ayalon Highways

Related projects

icon_sent@3x
תודה! פנייתך התקבלה.

במידה וקורות החיים יימצאו מתאימים למשרה, נציגינו ייצרו עמך קשר.

במידה ולא זומנת לראיון או למבחני מיון בתוך 30 יום מפנייתך, לא תיחשב כמועמד ויש לראות הודעה זו כהודעה בכתב על אי
 קבלתך לתפקיד, בהתאם להוראות החוק.