ABUJA-ABAJI ROAD

NIGERIA

AT A GLANCE

PROJECT STATUS

Completion date: June 2014

CONSTRUCTING COMPANY

Shikun & Binui SBI infrastructure in conjunction with Reynolds Construction Company (Nig.) Ltd.

DEVELOPING COMPANY

Shikun & Binui SBI infrastructure in conjunction with Reynolds Construction Company (Nig.) Ltd.

About the project

Paving of a 54.70 km road, including bridges totaling 195 meters in length and a drainage system.

ABOUT THE PROJECT

Paving of a 54.70 km road, including bridges totaling 195 meters in length and a drainage system.

AT A GLANCE

PROJECT STATUS

Completion date: June 2014

CONSTRUCTING COMPANY

Shikun & Binui SBI infrastructure in conjunction with Reynolds Construction Company (Nig.) Ltd.

DEVELOPING COMPANY

Shikun & Binui SBI infrastructure in conjunction with Reynolds Construction Company (Nig.) Ltd.

Related projects

icon_sent@3x
תודה! פנייתך התקבלה.

במידה וקורות החיים יימצאו מתאימים למשרה, נציגינו ייצרו עמך קשר.

במידה ולא זומנת לראיון או למבחני מיון בתוך 30 יום מפנייתך, לא תיחשב כמועמד ויש לראות הודעה זו כהודעה בכתב על אי
 קבלתך לתפקיד, בהתאם להוראות החוק.