SDE BOKER

A solar photovoltaic (PV) power plant with a 5-MW capacity.
HATZERIM

A solar photovoltaic (PV) power plant with a 6-MW capacity.
TIMNA

A solar photovoltaic (PV) power plant with a 6-MW capacity.
BROSH

A solar photovoltaic (PV) power plant with a 9.632 MW capacity.
SHIBOLIM

A solar photovoltaic (PV) power plant with a 12.46 MW capacity.
Nevatim 2

A solar photovoltaic (PV) power plant with a 12.7MW capacity.
URIM

A solar photovoltaic (PV) power plant with a 3.3 MW capacity.
SHACHAR

A solar photovoltaic (PV) power plant with a 9.1-MW capacity.
GIVOLIM

A solar photovoltaic (PV) power plant with a 12.5-MW capacity.
SHNEUR TZE’ELIM

A photovoltaic (PV) power plant, built in cooperation with Kibbutz Tze’elim in the Negev, for the planning, financing, construction and operation of a solar power plant with a 120-MW capacity. The project covers about 350 acres of the kibbutz’s land, has completed construction and is currently undergoing commissioning and acceptance tests.